NKC has been building high quality of superior design residential accommodation in worldwide.

We have deep-understanding of the layout, final look of industrial & commercial premises.

We build roads and highways with an underlying sense of responsibility towards the nation.

We are also a global provider of Software-Development, IT Consulting & Outsourced-SoftwareDevelopment.

- National Projects Construction Corporation Ltd. Plot No. 67-68, sector 25, Faridabad
- Haryana Uraban Development Authority, Panchkula
- Haryana state Industrial Development Corporation Ltd. Panchkula
- IRCON International Ltd. New Delhi.
- PWD Haryana




A premier multi-disciplinary construction company with:
-- Rated By CRISIL "CRISIL Rating : SME 1" This Rating indicates Highest level of credit worthiness, adjudged in relation to other SME's.
-- An ISO 9001:2008 Certified Company
-- Multi-location projects
-- Regional Office : Mumbai
-- Clients spread across nationwide
-- Expertise in industrial projects, Highways, Expressways, State Highways, Bridges, Multi storey Housing Projects etc.
-- No arbitration dispute with any client
-- Staff strength-more than 525 with more than 100 professionals

Major Areas of Operation
-- National Highways, Expressways & State Highways
-- Bridges
-- Industrial Turnkey Projects
-- Multi storey Housing Projects

Industrial Projects
Hewitt Packard Ltd., Uttaranchal
Work Details : Construction of civil work at SIDCUL, Pantnagar, Uttaranchal under SPCL
Est. Cost of Project [Rs. In Crore] : 7.14

Reliance Life Sciences Pvt Ltd. (Bioteck Park) :
Work Details : Construction of R & D Centre kilolab Building at Mumbai.
Est. Cost of Project [Rs. In Crore] : 8.25

Jindal Drugs Limited :
Work Details : Construction of factory building for Jindal Drugs Limited in M.I.D.C. Plot No:-T-22, Taloja
Est. Cost of Project [Rs. In Crore] : 9.32

Asmeeta Infratech Private Limited :
Work Details : Construction of Factory/Weaving Units (A1 to A11 , B7 to B10) at Textile Park, Saravali Kon , MIDC, Bhiwandi, Kalyan.
Est. Cost of Project [Rs. In Crore] : 70.00

Residential Projects
Omaxe Ltd. :
Work Details : Construction of Multistoried Group Housing SH: Civil, Internal Pumbling & Electrical Works. (includes cost of steel etc.) at Rudrapur.
Est. Cost of Project [Rs. In Crore] : 32.20

Road & Highway Projects
AS-21
Work Details : Balance work of construction of 4-laning road from km.165.400 to km.190.587 of Jatinga Junction to Harangajo section of NH-54 in the State of Assam "Contract Package No. EW-II AS-21 (Bal)".
Est. Cost of Project [Rs. In Crore] : 333.83

AS-22
Work Details : Balance work of construction of 4-laning road from km.140.700 to km.165.080 of Narimbanglo to Jatinga Junction section of NH-54 in the State of Assam "Contract Package No. EW-II AS-22 (Bal)".
Est. Cost of Project [Rs. In Crore] : 318.68


AS-24
Work Details : Balance work of construction of 4-laning road from km.111.000 to km.127.000 of Lumding to Maibong section of NH-54E in the State of Assam "Contract Package No. EW-II AS-24 (Bal)".
Est. Cost of Project [Rs. In Crore] : 225.33

ETA Star Infrastructure Limited (ESIL)
Work Details : Widening and up gradation of existing 4-lane road to 6-lane road from km. 42+700 to km. 273+000 in the State of Haryana and Rajasthan- for contract Package-VI from km. 239+500 to km.273+000 ( C-Zone, D-Zone By-Pass) in the State of Rajasthan.
Est. Cost of Project [Rs. In Crore] : 225.00

Jai Prakash Associates Ltd. Yamuna Expressway Project :
Work Details : Construction of Six Lane Expressway between Noida and Agra ( Km 0+500 to Km 5+300) with provision for expansion to 8
Est. Cost of Project [Rs. In Crore] : 116.78

National Highway Authority of India
Work Details : Construction of "Four laning and strengthening of Existing 2 lane carriageway from Km 62.000 to Km 75.000 Including Tumkur Bypass on Bangalore-Pune Section of NH4 in the State of Karnataka"
Est. Cost of Project [Rs. In Crore] : 79.96

IRCON International Ltd.
Work Details : Execution of road works for UPSRP-01-Package-II, Katra to Swairajpur Section Km 0+00 to Km 80+00. (includes cost of material)
Est. Cost of Project [Rs. In Crore] : 62.82

D. S. Constructions Ltd.
Work Details : Conversion of Delhi - Gurgaon Section of NH-8 into an access controlled 8/6 lane highway
Est. Cost of Project [Rs. In Crore] : 16.82



Machinery : For Road Work Make Model Quantity
MOTOR GRADER VOLVO G710B-2001 12
MOTOR GRADER CAT 120H-2005
140H-2008
120K-2011
WHEEL LOADER HM 2021Z-2005 8
WHEEL LOADER TATA WL-2021
VIBRATORY SOIL COMPACTOR IR SD-110-2003 12
VIBRATORY SOIL COMPACTOR CAT
WIRTGEN
CS 553 - 2008
HAMM 311-2011
EXCAVATOR CAT/TATA/JCB/L & T KOMATSU/KOBELCO 320CL/210/JS-75/PC200 34
BULL DOZER  CAT D-5K 4
HYDRAULIC PILING RIG MAIT AR-180 1
JCB 3D JCB 3D 12
HOT MIX PLANT (BATCH TYPE) APPOLO ANP-1500 TPH-128 2
SENSOR PAVER (1800-2) 10Mtrs WIDTH
SENSOR PAVER (2100-2) 13Mtrs WIDTH
VOGGLE/CAT

VOGGLE
  2


1
WIRTGEN COLD MILLING   MACHINE W100 WIRTGEN W100 1
STONE CRUSHER WITH JAW CRUSHER, CONE CRUSHER & BAR MAKE METSO 200-TPH 2
WET MIX PLANT (100TPH) APPOLO TPH - 200 4
MECHANICAL PAVER ( FOR WMM) APPOLO   2
PNEUMATIC TYRE ROLLER VOLVO 220/HAMM   4
TANDEM ROLLER ESCORTS   5
LIGHT TANDEM ROLLER GREAVES COTTON   1
BITUMEN PRESSURE DISTRIBUTOR ALLWIN   3
TIPPER LPK 2516TC/38 TATA TATA MOTORS/ MAN FORCE 2516TC/38
CLA25.220
35
90
TIPPER TATA MOTORS SE1613/42 20
TIRAILOR TATA MOTORS
MANFORCE
2516TC 3
1
AIR COMPRESSOR     10
WATER TANKERS TATA MOTORS SE1613/42 10
BROOMER     5
TRACTOR WITH HYDRAULIC TROLLY FARM TRAC EICHER 15
HYDRA CRANE
TOWER CRANEHYDRA CRANE
LIGHT TOWER
ESCORT HYDRA 12SB
MTC2418 ACE
  3
2
1
RAMMERS/ COMPACTORSLIGHT TOWER     5
BAR BENDING MACHINE
BAR CUTTING MACHINE
    6
6


Machinery : For Structural Work Make Model Quantity
RMC BATCHING PLANT CP 30 SCHWING STETTER CP 30 4
RMC BATCHING PLANT CP 20 MACONS CP 20 1
CONCRETE PUMP SCHWING STETTER BP 350 DXT 2
CONCRETE BOOM PLACER PUTZMEISTER   1
PIPE LINE SCHWING STETTER CP 30 400mtrs
TRANSIT MIXER– 6 cum TATA LPK2516 6X4 15
MECHANICAL/ ELECTRICAL CONCRETE MIXER FITTED WITH WEIGH BATCHING EQUIPMENT     16
MECHANICAL / ELECTRICAL VIBRATORS     21
SHUTTERING MATERIAL   STEEL OF DIFFERENT SIZES SUFFICIENT FOR 12,000 sq. mtrs. AREA
STAGING EQUIPMENTS i.e PIPES, JACKS, STIRRUP HEADS ETC.     SUFFICIENT TO MATCH THE SHUTTERING PLATES


Machinery : Survey Instruments Make Model Quantity
ELECTRONIC TOTAL STATION SOKKIA SET-210-2004 8
AUTO LEVEL SOKKIA C-330 25
LEVELLING STAFF     50


Machinery : Laboratory Equipments Quantity
SOIL TESTING EQUIPMENT
AGGREGATE TESTING EQUIPMENT
BITUMINOUS TESTING EQUIPMENT
CONCRETE TESTING EQUIPMENT
Sufficient Laboratory Equipment is available to run 2 independent laboratories for road and structutral works