Roads & Highway

As India continues its forward march as a global economic power, her urban transport network is fast becoming the most important infrastructure to support its mega growth.

The staggering statistics tells it all :

  1. 2 million kilometres of roads with almost 960,000 kilometers of surfaced roads
  2. Fifty-three highways, almost 20,000 kilometers in length
  3. National highways carry about 40 percent of road traffic
  4. Around 60 percent of all passenger traffic travels by road.

NKC Projects have been, and will always strive to contributing to that growth – it has the will and capability to design, build and maintain world-class roads, highways and expressways.

Our roads and highway projects are not mere earth work for us – we take pride in every stage of their construction :

  1. Planning
  2. Building
  3. Meeting deadlines
  4. Maintaining

We build roads and highways with an underlying sense of responsibility towards the nation. We function like a precision-timed unit while building these very necessary urban infrastructural skylines. Over the last three years we have built :

  1. State Highways
  2. National Highways
  3. Bridges
  4. Culverts
  5. Storm Water Drains

Our Substantial Projects:

  • Four laning of Takoli
  • Work Details : Kullu Section of NH-21 (Package – III, from Km 242.000 to Km 272.000) under NHDP Phase-IVB on EPC Mode in the State of Himachal Pradesh .
  • Est. Cost of Project [Rs. In Crore] : 328.83
  • Four Laning of Obedullaganj to Itarsi
  • Work Details : Section of NH-69 from km. 2.800 to km. 8.300 and from km. 20.700 to km. 63.000 (Design Length 46.3 km.),excluding km. 8.300 to 20.700 Wild Life Area, in the state of Madhya Pradesh (Package-I /NH-69) on EPC Mode.
  • Est. Cost of Project [Rs. In Crore] : 609.36

Our Completed Projects:

  • AS-24
  • Work Details : Balance work of construction of 4-laning road from km.111.000 to km.127.000 of Lumding to Maibong section of NH-54E in the State of Assam "Contract Package No. EW-II AS-24 (Bal)".
  • Est. Cost of Project [Rs. In Crore] : 225.33
  • ETA Star Infrastructure Limited (ESIL) 08, Town Centre , Andheri-Kurla Road, Andheri (East) Mumbai-59
  • Work Details : Widening and up gradation of existing 4-lane road to 6-lane road from km. 42+700 to km. 273+000 in the State of Haryana and Rajasthan- for contract Package-VI from km. 239+500 to km.273+000 ( C-Zone, D-Zone By-Pass) in the State of Rajasthan.
  • Est. Cost of Project [Rs. In Crore] : 225.00
  • Jai Prakash Associates Ltd. Sector-128, NOIDA.
  • Work Details : Yamuna Expressway Project :Construction of Six Lane Expressway between Noida and Agra ( Km 0+500 to Km 5+300) with provision for expansion to 8.
  • Est. Cost of Project [Rs. In Crore] : 116.78
  • National Highway Authority of India, Plot No. G-5 & 6, Sector-10, Dwarka, New Delhi-75
  • Work Details : Construction of "Four laning and strengthening of Existing 2 lane carriageway from Km 62.000 to Km 75.000 Including Tumkur Bypass on Bangalore-Pune Section of NH4 in the State of Karnataka".
  • Est. Cost of Project [Rs. In Crore] : 79.96
  • IRCON International Ltd.
  • Work Details : Execution of road works for UPSRP-01-Package-II, Katra to Swairajpur Section Km 0+00 to Km 80+00. (includes cost of material).
  • Est. Cost of Project [Rs. In Crore] : 62.82
  • D. S. Constructions Ltd.
  • Work Details : Conversion of Delhi - Gurgaon Section of NH-8 into an access controlled 8/6 lane highway.
  • Est. Cost of Project [Rs. In Crore] : 16.82