4-Laning Of Obedullaganj - Itarsi
Balance work for the 4-Laning of Obedullaganj to Itarsi Section of NH-69 from km 2.800 to km 8.300 and from km 20.700 to km 63.000 (Design Length 46.3 km.), excluding km. 8.300 to 20.700 WildLife Area, in Madhya Pradesh (Package-I /NH-69) on EPC Mode.