#

Roads & Highways

As India continues its forward march to become a global economic power, her urban transport network is fast becoming the most important infrastructure to support its growth.

The staggering statistics tells it all :
  • 2 million kilometres of roads with almost 960,000 kilometers of surfaced roads
  • Fifty-three highways, almost 20,000 kilometers in length
  • National highways carrying about 40 percent of road traffic
  • Around 60 percent of all passenger traffic travels by road.

NKC Projects have been, and will always strive to contributing to that growth – we have the will and capability to design, build and maintain world-class roads, highways and expressways.

Our roads and highway projects are not mere projects for us – we take pride in every stage of their construction :
  • Planning
  • Building
  • Meeting deadlines
  • Maintaining
We build roads and highways with an underlying sense of responsibility towards the nation. We function with accuracy and precision while building these very necessary urban infrastructure. Over the last three years we have built :
  • State Highways
  • National Highways
  • Bridges
  • Culverts
  • Storm Water Drains

Our Completed Projects

Contract Package No. EW-II (AS-24), 4-Lane Road From Lumding To Maibong Section Of NH-54E In The State Of Assam

This project is a part of the East West Corridor and is primarily located in Hilly terrain. It involved huge cutting of hills (with depth of cutting up to 35m) in the entire stretch and had a huge requirement of earth moving equipment. The project involved construction of a number a minor bridges and a Major Bridge of 100m length.

Est. Cost of Project [Rs. In Crore] :250.22

Pink City Expressway-6-Lane Road Of BH-8 Near Jaipur Rajasthan

This Project was completed satisfactorily and was the first among other stretches to be handed over. The Challenges in the project ranged from heavy existing traffic load, unseasoned and unprecedented monsoon conditions, extremely hot weather conditions apart from mobilization and coordination of a variety of resources required for the project.

Est. Cost of Project [Rs. In Crore] : 217.46

Jorabat – Shillong Expressway – 4-Lane Road Of NH-40 In The State Of Assam And Meghalaya

This Prestigious project was executed in a timely manner with great emphasis on quality. The execution of this project was very difficult due to the huge quantity of Hard Rock excavation in the entity of hilly terrain. The execution of the project also involved construction of a 160m long River Bridge with Steel/ Composite Girder.

Est. Cost of Project [Rs. In Crore] : 202.39

World Bank Funded Project Of 2-Lane Road Of SH-42 From Garautha To Chirgaon In The State Of Uttar Pradesh

Est. Cost of Project [Rs. In Crore] : 189.99

World Bank Funded Project Of 2- Lane Road Of SH-9 From Duhuria To Chandbali In The State Of Odisha

Est. Cost of Project [Rs. In Crore] : 170.43

World Bank Funded Project Of 2- Lane Road Of SH-9 From Pirhat To Chandbali In The State Of Odisha

Est. Cost of Project [Rs. In Crore] : 104.20

Yamuna Expressway – 6-Lane Road Rigid Pavement Highway In The State Of Uttar Pradesh

This project involved Construction of access controlled Six Lane Rigid Pavement Highway on high embankment.

Est. Cost of Project [Rs. In Crore] : 116.78

Delhi Gurgaon Expressway -8-Lane Road Of NH-8 In The State Of Delhi And Haryana

This prestigious and important project involved overlaying of this stretch and was completed satisfactorily in spite of Heavy Traffic and politically sensitive location with great efforts in terms of planning, mobilization, execution and monitoring. There was a great emphasis on Safety and Quality during the execution of the project and this project is known as one of the best Road Projects in India.

Est. Cost of Project [Rs. In Crore] : 83

Tumkur Bypass -4- Lane Road On NH-4 In The State Of Karnataka

This High priority project was completed in 18 months with round the clock working in spite of Heavy Traffic Load on the existing highway. This project included construction of 3 Grade Separator (GS), 4 Vehicular Under Passes (VUP) and 3 Non Vehicular Under Passes (NVUP).

Est. Cost of Project [Rs. In Crore] : 72.19

World Bank Funded Project 2- Lane Road From Katra To Swairajpur In The State Of Uttar Pradesh

Est. Cost of Project [Rs. In Crore] : 62.82