As India continues its forward march to become a global economic power, her urban transport network is fast becoming the most important infrastructure to support its growth.
NKC Projects have been, and will always strive to contributing to that growth – we have the will and capability to design, build and maintain world-class roads, highways and expressways.
This project is a part of the East West Corridor and is primarily located in Hilly terrain. It involved huge cutting of hills (with depth of cutting up to 35m) in the entire stretch and had a huge requirement of earth moving equipment. The project involved construction of a number a minor bridges and a Major Bridge of 100m length.
Est. Cost of Project [Rs. In Crore] :250.22
This Project was completed satisfactorily and was the first among other stretches to be handed over. The Challenges in the project ranged from heavy existing traffic load, unseasoned and unprecedented monsoon conditions, extremely hot weather conditions apart from mobilization and coordination of a variety of resources required for the project.
Est. Cost of Project [Rs. In Crore] : 217.46
This Prestigious project was executed in a timely manner with great emphasis on quality. The execution of this project was very difficult due to the huge quantity of Hard Rock excavation in the entity of hilly terrain. The execution of the project also involved construction of a 160m long River Bridge with Steel/ Composite Girder.
Est. Cost of Project [Rs. In Crore] : 202.39
Est. Cost of Project [Rs. In Crore] : 189.99
Est. Cost of Project [Rs. In Crore] : 170.43
Est. Cost of Project [Rs. In Crore] : 104.20
This project involved Construction of access controlled Six Lane Rigid Pavement Highway on high embankment.
Est. Cost of Project [Rs. In Crore] : 116.78
This prestigious and important project involved overlaying of this stretch and was completed satisfactorily in spite of Heavy Traffic and politically sensitive location with great efforts in terms of planning, mobilization, execution and monitoring. There was a great emphasis on Safety and Quality during the execution of the project and this project is known as one of the best Road Projects in India.
Est. Cost of Project [Rs. In Crore] : 83
This High priority project was completed in 18 months with round the clock working in spite of Heavy Traffic Load on the existing highway. This project included construction of 3 Grade Separator (GS), 4 Vehicular Under Passes (VUP) and 3 Non Vehicular Under Passes (NVUP).
Est. Cost of Project [Rs. In Crore] : 72.19
Est. Cost of Project [Rs. In Crore] : 62.82